Call us: (562) 596-9988
Mail us: info@carterautomation.com
Phone: 1-562-596-9988
Fax: 1-562-683-2140
Email: info@carterautomation.com

Portfolio

 
“The Client Comes First”
 

Your project is priority when Carter Industrial Automation is on the job. We are well equipped to take on any job regardless of project duration or required staffing size. Carter I/A maintains an ample amount of full-time personnel trained continuously with the newest rules, regulations, and safety procedures required to promote our commitment to excellence and maintain our superior performance. Below are a few examples of the projects we have been involved in:

 

 

Control System Installation and Start-up:
City of Coachella
Avenue 54 Pump Station
Plant-wide SCADA/Control
Boston Edison Company Mystic Generating StationPlant-wide SCADA/Control
Duke/Fluor Daniel Frontera Generating FacilityPlant-wide SCADA/Control
200 MW Combined Cycle
Southern California Edison El Segundo Generating StationUrea Injection System Jacksonville Electrical Authority St. Johns River Power Park650 MW Corp. Dominicana de Electricidad Itabo II Generating St. 160 MWPlant-wide SCADA/Control
United States Navy North Island Naval Air StationPlant-wide SCADA/Control Castaic Lake Water Agency Rio Vista Water Treatment PlantPlant-wide SCADA/Control City of Los Angeles Hyperion Waste Treatment PlantDesulfurization Process Control
Control System Design:
Florida Power and Light Turkey Point Power StationPartial Turbine Bypass Control Castaic Lake Water Agency Rio Vista Water Treatment PlantPlant-wide SCADA/Control Southern California Edison El Segundo StationAdvanced Plant Simulator R&D
Control System Tuning:
Duke Energy, North America Morro Bay Power Plant (3 & 4)Combustion Control – 345 MW City of Los Angeles Hyperion-Scattergood Steam LineAuxiliary Steam Control – 100KPPH Pacific Power and Light Jim Bridger Power StationFlue Gas Desulferization
Control Logic Design:
Duke Energy, North America Morro Bay Power PlantNOx Optimization City of Los Angeles Hyperion-Scattergood Steam LineAuxiliary Steam Control Miller Brewing Company Irwindale PlantPallet Unloader Sequencing
Project / Construction Management:
Duke Energy, North America Morro Bay Power PlantBurner Management Retrofit
$500K
Caesar’s Palace Caesar’s Race for AtlantisSpecial Effects
$575K
Medical Arts Building and LaboratoryUtilities Design and Construction
Principal-in-Charge
$4M
City of Los Angeles Terminal Island Treatment PlantEnergy Management System
$700K
Good Samaritan Hospital Radiology Suite$800K
Duke Energy, North America Moss Landing Power PlantEnergy Mgt Ctr Construction
$2.4M
MGM Grand Retail Las Vegas Airport Retail StoreSpecial Effects
$335K
Duke Energy, North America Morro Bay Power Plant$300K
Domar Electric Municipal Water ProjectsSCADA Integration
$925K
Technical Writing:
US Department of Agriculture Incineration Evaluation StudyTechnology Development Ctr. Southern California Edison El Segundo Generating StationStation Manual Trader Joe’s-Main Office HVAC Evaluation Report
Technical Instruction:
Pacific Power and Light Jim Bridger Power StationBailey Network 90 DCS – 1yr. City of Los Angeles Hyperion Waste Treatment PlantDesulfurization Process O&M Castaic Lake Water Agency Rio Vista Water Treatment PlantDistributed Process Control
Engineering Services:
Torrance Unified School District Renovation of Boilers & HVAC Systems City of Los Angeles Terminal Island Treatment PlantTertiary Filter Investigation & Report White Memorial Medical Plaza Remodel/Improvements & Design